High performance hvac on march 11 2020 at 10 27 pm.
Duct smoke detector sampling tube installation.
Installation instructions for the duct smoke detector a.
One sampling tube end cap 5.
Once any sampling tube length adjustments are made plug the end of the sampling tube with the provided end cap.
4 6 p n 3101210 rev 02 iss 28jan13.
Prior to the installation of the damper and smoke detector.
For proper air sampling duct pressure should be a minimum of 0 01 inches of water.
Sensor power board assembly and cover s 2.
4 detector installation 4 1 verify duct air flow direction and velocity.
Furthermore intentions for using duct smoke detectors should not be a substitute for area smoke detectors.
Duct smoke detector a.
See table 1 on page 3 to determine the inlet tube required for different duct widths.
St 10 for duct widths of 6 to 1 0 st 25 for duct widths of 1 0 to 3 0 st 50 for duct widths of 3 0 to 5 0 requires support.
One plastic exhaust tube.
Sampling tubes install from front or rear of detector compatible with existing accessories 4 contents of the duct smoke detector kit 1.
Verify this by checking specifications of installation and if necessary use an alnor model 6000p velocity meter or equivalent to check the air.
Duct detectors smoke detection installation.
Sampling tube assembly see figure 2 the duct detectors are designed for use in ducts where the air velocities are from 300 to 4000 feet per minute.
A sampling tube must be ordered to complete the installation.
The inlet sampling tube is to be located between blades to avoid blockage of the airflow past the tube.
Three 10 sheet metal screws for mounting 3.
The end cap is needed to cre ate the proper air flow to the sensor of the duct smoke detector.
The sampling tube end cap included with the detector is critical to proper operation of the duct smoke detector.
E pdd duct smoke detector installation sheet operation the duct smoke detector s primary purpose is to provide early.
The specified operating range of the detector make sure the sampling tube air holes are not obstructed and are facing the hvac system airflow.
Duct preparation the duct detectors are designed for use in ducts where the air velocities are from 300 to 4000 feet per minute.
Sampling tube installation the ad2 series duct smoke detectors use a specially notched sampling tube which may be ordered separately in one of four standard lengths.
Once any sampling tube length adjustments are made plug the end of the sampling tube with the provided end cap.
The end cap is needed to create the proper air flow to the sensor of the duct smoke detector.
It must be the correct length for the width of the duct where it will be installed.
Do you know if it is a code requirement to support sampling tubes greater than 3 at the opposite end of the duct detector.